PLATFORM ECOSYSTEM · ERP / PIM

Put every configuration on the same business data line.

Across ERP, PIM, PLM, CRM and WMS, first establish ownership of product, price, inventory, customer, order and BOM data, then design traceable connections.

  • Master data
  • BOM & orders
  • System boundaries
INTEGRATION MAP · ROUTING BLUEPRINT
01

Master-data systems

Product, price, inventory and customer

02

ii3d configuration & quote

Selections, rules and outcomes

03

Business & production systems

BOM, order, work order and status

Connection method and field scope are confirmed during assessment.
01 · BUSINESS CONTEXT

See the business breaks clearly first.

Not another system layer — a way to connect configuration, operations and delivery in the workflow you already run.

01

Data ownership is unclear

Product, pricing and inventory have multiple versions, leaving the configurator without a trusted source.

02

Configuration output is not production-ready

Sales configurations still require manual translation into production materials, processes or order fields.

03

Changes are hard to trace

After fields, SKUs or rules change, teams cannot quickly find the affected configurations and orders.

02 · CONNECTION DESIGN

How the route moves from input to business outcome.

Agree responsibilities and information boundaries at each stage before choosing the technical connection.

Get an integration assessment
  1. 01

    Master-data systems

    Product, price, inventory and customer

  2. 02

    ii3d configuration & quote

    Selections, rules and outcomes

  3. 03

    Business & production systems

    BOM, order, work order and status

03 · CAPABILITIES

Design the key connection points for handoff.

These are the capabilities to confirm during assessment and delivery; they do not replace technical validation in the project.

01

Define system responsibilities first

Record the source of truth, read scope, write scope and final owner in the integration blueprint.

02

Build object and field mappings

Create reviewable mappings for SKUs, selections, BOMs, quotes, orders and customers.

03

Design the business flow

Separate master-data delivery, configuration return, order handoff and inventory or status updates.

04

Keep a change trail

Reserve queryable records and ownership for versions, failed events and manual handling.

04 · APPLICATION SCENARIOS

Use concrete scenarios to decide what to connect first.

These are typical delivery scenarios that use no client names or sensitive data, helping define an initial scope.

Product master-data governance

Clarify the source of products, options and prices so teams do not maintain conflicting versions.

Custom quote to BOM

Turn approved selections into structured results that downstream systems can understand and review.

Order-to-production coordination

Hand off sales outcome, order context and production information along the same route.

05 · IMPLEMENTATION PATH

Use four steps for a controlled integration.

Use source material, samples and a test environment to reduce rework and align business and technical teams.

  1. Step 01

    Map the current system landscape

    Map systems, interfaces, data owners and the business points that need connection.

  2. Step 02

    Confirm data ownership

    For each core object, confirm the source, update authority and target systems requiring write-back.

  3. Step 03

    Review mappings with samples

    Use anonymized product, quote and order examples to review mappings and exception scenarios.

  4. Step 04

    Validate and hand over governance

    After validating the end-to-end flow, define collaboration for changes, monitoring and manual handling.

06 · FAQ

Common questions

Before a project begins, clarify scope, ownership and the materials to prepare.

Which system should be the product source of truth?

This depends on current business governance. The page helps make ownership explicit rather than replacing existing systems by default.

How are non-standard BOMs represented?

First confirm non-standard rules, composition and the receiving system’s object model, then define the boundary from configuration result to BOM.

Does the ERP need modification?

It depends on existing interfaces, fields and desired flow. The assessment separates reusable capabilities from extensions that need project confirmation.

Which technical materials are needed?

Prepare a system inventory, interface notes, data dictionary, permission constraints, test environment and anonymized business examples.

Bring your current stack and target flow. We’ll map the connection path together.

Share your current platform, business flow and constraints for an integration assessment tailored to the project.

Get an integration assessment